Trusted by 1,500+ clients for PCB manufacturing and one-stop services, Ace Golden empowers enterprises to accelerate growth.

1500+users choose Ace Golden, PCB board processing and manufacturing, one-stop service, Gaode Electronics helps enterprises develop rapidly
1500+users choose Ace Golden, PCBA processing, one-stop service, Gaode Electronics helps enterprises develop rapidly
PCB Prototyping
Fast turnaround: 1-2 days for urgent prototyping; 2-10 days for standard orders (faster than industry averages),50% discount on expedited prototyping fees
PCB Small-Batch Production
70-minute vertical jet printing,Surface copper thickness exceeding industry standards,Laser-marked characters for superior clarity,Complimentary testing included.
High-Precision PCBs
Minimum line width & spacing: 2/2 mil,Minimum via hole: 6 mil,Minimum board thickness: 0.2 mm; Maximum board thickness: 5 mm,Aspect ratio: 15:1
FPC & Rigid-Flex PCBs
Ace Golden now offers processing services for FPC (Flexible PCBs) and rigid-flex PCBs. For detailed specifications, please contact our customer support team.| Specification | Prototype | |
|---|---|---|
| Number Of Layers | 2-48 L | 2-36 L |
| Board Thickness | 0.2-17.5mm | 0.2-10mm |
| Minimum Mechanical Aperture | 0.15mm | 0.15mm |
| Minimum Laser Aperture | 3mil | 4mil |
| HDI Type | 1+n+1,2+n+2,······,Anylayer (Any layer interconnection) | 1+n+1,2+n+2,······,Anylayer (Any layer interconnection) |
| Minimum Line Width&Spacing | 2/2mil | 3/3mil |
| Impedance Control | +/-5% | +/-10% |
| Maximum Copper Thickness | 12oz | 6oz |
| Maximum Plate Thickness Aperture Ratio | 18:1 | 16:1 |
| Maximum Board Size | 650mm X 1130mm | 610mm X 1100mm |
| Board Material | FR4/Hi-Tg/Rogers/Halogen Free/ RCC/PTFE/Nelco/Mixed Pressure Material |
|
| Surface Treatment | HASL、HASL PB FREE Immersion Gold/Tin/Silver Gold Finger Plating OSP、Immersion Gold + OSP |
|
| Special Processes | Buried/blind holes, step grooves, metal substrates, buried resistors, buried capacitors, mixed voltage, rigid-flex bonding, back drilling, step gold fingers, etc. | |
| Number Of Layers | Mass Production | Prototype | Urgent Order |
|---|---|---|---|
| 2 layers | 9 days | 5 days | 48 Hours |
| 4 layers | 10 days | 5 days | 3 days |
| 6 layers | 12 days | 6 days | 3 days |
| 8 layers | 12 days | 7 days | 4 days |
| 10 layers | 14 days | 10 days | 4 days |
| 12 layers | 16 days | 10 days | 5 days |
| 14 layers | 18 days | 12 days | 6 days |
| 16 layers | 18 days | 12 days | 6 days |
| 18 layers | 20 days | 14 days | 6 days |
| 20 layers | 20 days | 14 days | 10 days |
| 22 layers | 22 days | 14 days | 10 days |
| 24 layers | 24 days | 14 days | 10 days |
| 26 layers | 26 days | 14 days | 10 days |
| 28 layers | 28 days | 14 days | 10 days |
| 30 layers | 30 days | 14 days | 10 days |
| 32 layers | 32 days | 14 days | 10 days |
Note: Delivery times exclude engineering lead time (typically 2-7 days). Contact our team for customized delivery schedules.